Cape Lambert Port B

Dust tight and protected against heavy seas
https://koenigs.com.au/wp-content/uploads/2020/04/rio-tinto-iron-ore-cape-lambert-custom-local-isolator.jpg

Cape Lambert Port B

Title:

Description:

rio-tinto-iron-ore-cape-lambert-custom-local-isolator.jpg

Rio Tinto Iron Ore commissioned a local visible load break isolator with an IP66 enclosure for the massive ship loading plant at Cape Lambert. We designed and manufactured the CLB IsoLcs for the project on time and budget.

Category
IP66isolator design
Location
Pilbara Region WA
Client
Rio Tinto Iron Ore